- 24 Hour Emergency: 814.870.8087
- Call 811 Before You Dig
- Pay by Phone: 1.855.907.3211
Standard Construction Details
- [EWW-CD-001] Water Service Tap (3/4″ & 1″)
- [EWW-CD-002] Water Service Tap (1.5″ & 2″)
- [EWW-CD-003] Blow Off Sampling Station
- [EWW-CD-004A] Air Release Valve in Vault
- [EWW-CD-004B] Air Release Valve in Pit
- [EWW-CD-006] Concrete Encasement
- [EWW-CD-007] Fire Hydrant Assembly
- [EWW-CD-008] Tapping Sleeve (Live Tap) with Thrust Block
- [EWW-CD-009] Gate Valve & Valve Box
- [EWW-CD-010] Steel Casing & Ductile Iron Water Main (Bore)
- [EWW-CD-011] Stream Crossing (Open Cut)
- [EWW-CD-012] Temporary Fill Connection (No Hydrant)
- [EWW-CD-013] Temporary Fill Connection (Hydrant)
- [EWW-CD-014] Concrete Thrust Blocking; Plugs & Bends
- [EWW-CD-015] Concrete Thrust Blocking; Tee & Vertical Bend Up
- [EWW-CD-016] Concrete Thrust Blocking; Vertical Bend Down
- [EWW-CD-017] Water Main Trench Detail (Improved Surface)
- [EWW-CD-018] Water Main Trench Detail (Unimproved Surface)
- [EWW-CD-019] Gate Valve with Sample Taps for Stream Crossing