Engineering

Introduction

The Engineering Services Department oversees and coordinates service area expansion,
construction and water main extension policies, and field inspection. Engineering staff process
water service applications and construction permits, maintain EWW facility records, and implement
the Cross Connection Control Program. Department staffers are available to meet with current
and potential customers and/or their agents to ensure they receive an acceptable level of
water service. Completed water service applications and general questions can be emailed to engineeringservices@eriewaterworks.org. Plumbers and Contractors can submit proposed work plans for approval and annual backflow test reports to backflowprevention@eriewaterworks.org.

The links below provide the most commonly used applications and forms, standard EWW construction and water service details, information on backflow prevention, and staff contact information. EWW regularly updates and expands the available content on this site. We hope you will find this information to be helpful.

Water Service Application

  • Water Service Application: PDF

Standard Construction Details

  • EWW-CD-001 WATER SERVICE TAP (0.75″ & 1″): PDF
  • EWW-CD-002 WATER SERVICE TAP (1.5″ & 2″): PDF
  • EWW-CD-003 BLOW OFF SAMPLING STATION: PDF
  • EWW-CD-004 AIR RELIEF VAULT: PDF
  • EWW-CD-005 AUTOMATIC FLUSHING UNIT: PDF
  • EWW-CD-006 CONCRETE ENCASEMENT: PDF
  • EWW-CD-007 FIRE HYDRANT ASSEMBLY: PDF
  • EWW-CD-008 TAPPING SLEEVE (LIVE TAP) WITH THRUST BLOCK: PDF
  • EWW-CD-009 GATE VALVE AND VALVE BOX: PDF
  • EWW-CD-010 STEEL CASING AND DI WATER MAIN – BORE: PDF
  • EWW-CD-011 STREAM CROSSING (OPEN CUT): PDF
  • EWW-CD-012 TEMPORARY FILL CONNECTION (NO HYDRANT): PDF
  • EWW-CD-013 TEMPORARY FILL CONNECTION (HYDRANT): PDF
  • EWW-CD-014 CONCRETE THRUST BLOCKING, PLUGS AND BENDS: PDF
  • EWW-CD-015 CONCRETE THRUST BLOCKING, TEE AND VERTICAL BEND UP: PDF
  • EWW-CD-016 CONCRETE THRUST BLOCKING, VERTICAL BEND DOWN: PDF
  • EWW-CD-017 WATER MAIN TRENCH DETAIL (IMPROVED SURFACE): PDF
  • EWW-CD-018 WATER MAIN TRENCH DETAIL (UNIMPROVED SURFACE): PDF
  • EWW-CD-019 GATE VALVE WITH SAMPLE TAPS FOR STREAM CROSSING: PDF

Standard Water Service Details

  • EWW-SD-001 DOMESTIC SERVICE (CONTINUOUS ROLL OF COPPER): PDF
  • EWW-SD-002 DOMESTIC SERVICE (0.75” & 1” METER PIT): PDF
  • EWW-SD-003 DOMESTIC SERVICE (1.5” & 2” METER PIT): PDF
  • EWW-SD-004 DOMESTIC SERVICE W/ BFP (CONTINUOUS ROLL OF COPPER): PDF
  • EWW-SD-005 DOMESTIC SERVICE W/ BFP (ENCLOSURE): PDF
  • EWW-SD-006 FIRELINE 2” AND SMALLER (CONTINUOUS ROLL OF COPPER): PDF
  • EWW-SD-007 FIRELINE 2” & SMALLER (ENCLOSURE): PDF
  • EWW-SD-008 FIRELINE 4” & LARGER (LESS THAN 100′): PDF
  • EWW-SD-009 FIRELINE 4” & LARGER (ENCLOSURE): PDF
  • EWW-SD-010 YARD HYDRANT (0.75” AND 1” METER PIT): PDF

Backflow Prevention / Cross Connection Control

Backflow is an undesired reversal in the normal direction of water flow. The normal direction is from the EWW water system to the customers; a backflow or cross connection would be from the customer to the EWW water system. EWW must protect the public water system and its Cross Connection Control Program empowers its staff to do so. The installation of an appropriate backflow preventer will protect the public water system from possible contamination.

  • Customer Forms

    • Water Use / Cross Connection Control Survey: PDF
    • Fire Protection Cross Connection Control Survey: PDF
  • Backflow Tester Information and Forms

    • EWW Licensed Backflow Preventer Tester List: PDF
    • 2012 Backflow Preventer Test Report: PDF
    • EWW Service Area Map for Backflow Testers: PDF
  • Resources and Links

    • US EPA Cross Connection Control Manual: PDF
    • University of Southern California (USC) Approved Backflow Preventers:
      www.usc.edu/dept/fccchr
    • American Society of Sanitary Engineers (ASSE) Approved Backflow Preventers:
      www.asse-plumbing.org

Contact Information

Engineering Services Department
240 West 12th Street
Erie, PA 16501
Phone: 814-870-8000
Fax: 814-870-8011

For General Inquiries and to transmit Water Service Applications electronically: engineeringservices@eriewaterworks.org

For Backflow / Cross Connection Control proposed work plans and to submit annual test reports: backflowprevention@eriewaterworks.org


Department Staff:

Craig H. Palmer, P.E.
Engineering Services Manager
ext. 208
cpalmer@eriewaterworks.org

Peter N. Hirneisen
Project Engineer
ext. 202
phirneisen@eriewaterworks.org

Gary “Jamie” Persino, GISP
GIS Coordinator
ext. 201
gpersino@eriewaterworks.org

Craig R. Kern
Special Projects Manager
ext. 305
ckern@eriewaterworks.org

Mark R. Santia
Engineering and Cross Connection Control Supervisor
ext. 205
msantia@eriewaterworks.org

Darlene Grandinetti
Engineering Services Representative
ext. 207
dgrandinetti@eriewaterworks.org

Brian D. Young
Inspector
ext. 206
byoung@eriewaterworks.org

Ed Murzynski
PA One Call Supervisor
ext. 211
emurzynski@eriewaterworks.org

Justin Stangl
GIS Support Technician / Inspector
ext. 204
jstangl@eriewaterworks.org

Krystyna Medeksza
GIS Support Technician / Inspector
ext. 203
kmedeksza@eriewaterworks.org